Thursday, June 22, 2023

NASA Artemis V Moon Rocket Engine Final Test: Preparing for Crewed Missions

NASA Artemis V Moon Rocket Engine Final Test: Preparing for Crewed Missions

An Aerojet Rocketdyne RS-25 rocket engine (RS-25 Engine 10001) was tested on the Fred Haise Test Stand (formerly A-1 Test Stand) at the John C. Stennis Space Center in Mississippi, on June 22, 2023, at 17:53 UTC (12:53 CDT). This was the final hot fire test in a 12-test series of the newly redesigned RS-25 engines that will be used beginning with Artemis V. The test had a planned duration of 500 seconds, the same amount of time the engines must fire during an actual flight of NASA’s Space Launch System (SLS).

Four RS-25 engines fire simultaneously to generate a combined 1.6 million pounds of thrust at launch and 2 million pounds of thrust during ascent to help power each SLS flight. NASA and Aerojet Rocketdyne modified 16 engines remaining from the Space Shuttle Program, which were proven flightworthy at Stennis for Artemis missions I through IV.

Every RS-25 engine that will help power SLS will be tested at NASA Stennis. RS-25 tests at the site are conducted by a combined team of NASA, Aerojet Rocketdyne, and Syncom Space Services operators. Syncom Space Services is the prime contractor for Stennis facilities and operations.

Through Artemis missions, NASA will land the first woman and the first person of color on the surface of the Moon, paving the way for a long-term lunar presence and serving as a steppingstone on the way to Mars.

For information about the Space Launch System, visit: 

Credit: NASA's Stennis Space Center
Acknowledgement: SciNews
Duration: 9 minutes
Release Date: June 22, 2023

#NASA #Space #Artemis #ArtemisV #Moon #Rocket #SpaceLaunchSystem #SLS #Engine #RS25 #AerojetRocketdyne #MoonToMars #DeepSpace #Propulsion #Engineering #Technology #NASAStennis #Mississippi #MSFC #UnitedStates #SolarSystem #Exploration #STEM #Education #HD #Video

No comments:

Post a Comment